2026 – Deck Roof & Enclosed Stairs

My hope is that this is the final major renovation to the garage space in Wellfleet. The biggest challenge was figuring out how to get a building permit without dealing with the zoning board. That was accomplished by scaling the project back a bit and just using the existing space available. The deck “room” would utilize the existing deck space, an eight by twenty foot area, and we would add a structure around the existing stairs, rebuilding the stairs of course, and thereby providing a single entrance with access to both the street level and second level areas.

All the work is being done by Skyline Homes of Cape Cod

This project has been on the drawing board of my mind for about ten years. Since the original use for this property has radically changed over the years, I decided that it would be better to add some valuable space to the garage loft apartment. When this project is done the expanded footprint will provide a better living space, as well as a sheltered entrance and exit during foul weather, especially winter snow.

9.17.26
As of today much has been accomplished on this project. The deck room floor, walls and roof are in place with window openings for four 60×54 rolling casement windows. The stairs are in, and the stairway roof line (shown below in the 3D model) has become a reality and will be framed next week. All is moving along as planned.

9.29.26
This week Skyline is finishing enclosing the stairway. There will be an exterior entry door at the bottom of the enclosed stairway (yellow exterior door sans window in 3D drawing), and an interior entry door to the deck and second floor apartment at the end of the top landing (brown door at the top of the stairs at the end of the landing). Last week they added another footing to reinforce the roof where it changes pitch about half way down the stairs. Today they added the framing for the roof and the upper landing, and boxed it in with plywood. Moving right along.